Bodegraven City Hall

Lighting control from a human perspective.

The city hall of Bodegraven was being renovated and the main goal was to do this in a sustainable way while maintaining the current ceiling. LED lighting with the addition of lighting controls was an important part of it. The installation of all 400 e-Sense Organic luminaires was realized in only one weekend and the result was smart LED lighting!

Project

As the building was already existing and filled with old luminaires, the need was high to keep the costs low and as smart as possible. Also they wanted to keep the existing ceiling and were looking for luminaires that could easily replace the old ones.

The consultant company DWA, compared different lighting control systems, but all solutions had the same disadvantage of higher installations costs for the additional wiring.

Solution

When Fagerhult explained the advantages and possibilities of e-Sense Organic (easy installing / build in sensors / plug and play / no wires…) the choice was quickly made.

Three different areas needed three different solutions:

The Offices
As the luminaires needed to fit into the existing modular ceilings, Fagerhult choose for the offices for the Recesso bandraster which was custom made for this project (with the e-Sense Organic sensor integrated).

The Traffic Areas
For the traffic areas, the Pleiad Evo controlled by e-Sense Organic.

Stairwells
Lighting control in stairwells offer huge potential for reducing energy consumption in a building without additional wiring. Discovery Evo with e-Sense Move was the perfect solution for the stairs.