Anders aspling, project leader at Nordic Project Solutions AB, a Project Management Company, led the Booster Pro project in everything from planning, design, production, logistics, lighting, warehousing to the final assembly of the shop.
”Booster Pro had a very clear vision of how they wanted the lighting to be, our job was to find the right partner to realize it”, says Anders Aspling.
Anders contacted Fagerhult and together with concept developers Erik Torstensson and Paul Esplana, Fagerhult delivered a lighting solution that met Booster Pro’s expectations. After studying 3D visualizations from Booster Pro, the concept development team put together a lighting calculation and a visualization in Archi CAD (a design software and basis for renderings).
The lighting calculation shows the luminaires in the shop with their estimated per Lux (lumens per square meter) light levels and also offers a sense of how the lighting will function.