Installation, troubleshooting and maintenance

Luminaire’s installation
Familiarise yourself with the supplied installation instructions and follow them during installation. When testing the insulation of an installation, luminaires equipped with HF-ballasts should have the phase and neutral conductors interconnected. Measurement may only be made between the interconnected phase neutral conductors and the protective earth with maximum 500V direct voltage. Once measuring is complete do not forget to disconnect the phase and neutral conductors before reconnecting these correctly to the terminal blocks.
Read more in the PDF document below.
