Installation, troubleshooting and maintenance

Familiarise yourself with the supplied installation instructions and follow them during installation.

When testing the insulation of an installation, luminaires equipped with HF-ballasts should have the phase and neutral conductors interconnected. Measurement may only be made between the interconnected phase neutral conductors and the protective earth with maximum 500 V direct voltage.

Once measuring is complete do not forget to disconnect the phase and neutral conductors before reconnecting these correctly to the terminal blocks.